Compliance Committee
[formerly the Design Review Committee]

The Design Review Committee is now called the Compliance Committee. Generally, all changes in structures on all Lots and appearances of the structures must be submitted to and approved by the Compliance Committee in advance, except for the following items that have been pre-approved for construction and do not require submission to the Compliance Committee:

Fences.
Fence locations in Remington Place must be approved by the Compliance Committee prior to construction. Wrought iron or aluminum fences from 4’ to 6’ tall with pickets spaced from 4” to 6” part and painted or anodized black are pre-approved materials. It is suggested that steel fences have a good protective coating of baked on enamel or galvanizing to extend their service life.

Mailboxes.
Mailboxes mounted on wooden stands, as found throughout the Remington neighborhood, are acceptable. Mailbox stands constructed of brick or stone pillars roughly 2’ square and 5’ tall may be used as long as the brick or stone is consistent in color & texture with materials used throughout the neighborhood. USPS standards must be used to determine both the physical location of the mailbox pedestal as well as the height of the actual mailbox unit.

The following are the members of the Committee:

Dave Sproul 2002 N. Cranbrook 644-9444 sproulcons@gmail.com

Phyllis Robertson 1830 N. Cranbrook ST 201-6243 pjrobertson@cox.net  

Click on Restrictive Covenants to review the various restrictions. Click on Compliance Committee to review its powers and authority.