Generally, all changes in structures on all Lots and appearances of the structures must be submitted to and approved by the Design Review Committee ("DRC") in advance, except those items which have been pre-approved by the DRC. The following are the members of the DRC:
Click on the following links to review the various provisions of the Restrictive Covenants about the DRC: Section 5.01. Approval Required. Section 5.02. Form of Plans and Specifications. Section 5.03. Retention of Approved Plans and Specifications. Section 5.04. Removal and Alteration of Structures: Lien Section 5.05. Certificate of Compliance Section 5.06. Right of Inspection |